You are in: results> deliverables

-------------------------------------------------------------------------------------------------------------------

Deliverables

---------------------------------------------------------------------------------------------------------------------

D5.3 Final measurement report of the E3Network transceiver integrated in the network

Executive Summary

According to the DoW, D5.3 should contain the results, analysis and discussion of the measurements on the E3Network transceiver integrated in the testbed and connected to the network. These results have been presented in deliverable D5.2 and, thus, will not be repeated in this deliverable.

 

 

 

 

 

> Return to deliverables

 

 

 

 

 

 

  • Project acronym
    E3Network

  • Project title
    Energy Efficient E-band transceiver for backhaul of the future networks

  • Project reference
    FP7-ICT-317957

  • Project coordinator
    CEIT (Spain)

  • Start date: 01/12/2012
    End date: 31/05/2016

Sponsored by

EU flag

FP7 logo